We have been putting it off due to a number of reasons, but finally met a contractor that does solid work, and completes the job quickly. We are very happy with our contractor and will be happy to recommend after our jobs are complete 😉
Before and After
Demo day is my favorite. We took it to the studs, and then removed the studs. A complete remodel of the master bedroom space. We knocked out all the walls, and built new ones in different places. A 1970s bathroom design just does not work, and why not knock it out of the park. Before pictures below (don’t judge, we were gonna demolish it so why clean it).
Looking East, the front half of the old master bedroom.“The bathroom”. This was essentially it. Sink, commode, tub/shower, and submarine like pass throughs…closet to the right. Garbage sink/cabinets, are OUT! NO TUB!Poor Lisa has to suffer with this for 12 years. We are gonna make up for it. We now have a 3BR/Master BathBathroom mirror, sink, closet door.1979 tile, small window Tom and I put in in 2013ish.Before: “Pony Walls gotta go…The former study/office/parlor part of the master.Ready, set, GO! Who remodels in August in Texas when it’s been 107 for 800 straight days (31 actually)Removing the tile. All gone in 1 day.Demo.Demo was quick.Before we extend the wall 4ft out.1979 Insulation. “The Original”.Every single one of these studs comes out.The dreaded pony walls.Striped to the studs. Now for the plan…Day 1 – 2023 Master Bedroom RemodelDay 1 – 2023 Master Bedroom RemodelDay 1 – 2023 Master Bedroom RemodelContractor: “That’s a big bathroom.”
Me: “Yep”Contractor: “That’s a big bathroom.”
Me: “Yep”Contractor: “That’s a big bathroom.”
Me: “Yep”